You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

How To Install Low Voltage Switchgear Panels

lv switchgear panels installation method

The apparatus used for switching , controlling & protecting the electrical circuits & equipment is known as switchgear. The switchgear equipment is essentially used with switching & interrupting currents either under normal or abnormal operating conditions. A switchgear consists of devices such as switches , fuses , circuit breakers , …

Read More »

Cables & Wires Handling Storage and Pulling Method Statement Procedure

To protect cables from physical damage  and the environment, store indoors and protect from  moisture, construction  equipment,  falling objects, chemical spills, moving  vehicles, and other hazards. When the cables are received inspect the protective covering on the cable for evidence of shipment damage. Leave the  factory-applied   protective   cover   in  place   until  …

Read More »

Emergency Lighting System Installation Method Statement

Emergency Lighting System

You can find below Emergency Lighting System Installation Method Statement in steps that covers the pre-installation steps and after that installation procedure. Pre-installation checks for Emergency Lighting System Ensure the materials, equipment and components are as per approved material submittal and as per technical specification. Ensure that the drawings are …

Read More »