Tag Archives: method statement for optical fiber

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the cable laying installation and termination. Roles & Responsibilities Project Manager: Lead all construction… Read More »

Method Statement for Optical Fiber Cable Installation Project

Below is given the method statement for performing the installation of optical fiber cabling system for a project. The method is given from receiving the material on the installation site and what to do after that. Make sure that for all drawings and schedules necessary approvals are available. Offloading and handling of Fiber Optic cable Adequate… Read More »